King Super 20 Tenor double socket neck

This tenor socket from a Super 20 tenor had one of the screw lugs sheared off and had been previously soft soldered back on.

IMG_3219

 

It was desoldered

IMG_3222

A new outer tenon made on the lathe

IMG_3229

Slot and hole cut and drilled then silver soldered into place.

IMG_3230

New screw lugs fitted and silver soldered using low melt solder.

IMG_3243

Then soft soldered back on to the crook. Job done.

IMG_3247